Contract · Federal · Small Business Set Aside - Total
Whitney Lake Powerhouse Roof Repairs
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- FORT WORTH, TX
- Amount
- Amount not listed
- Posted
- Mar 11, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 238160 - Roofing Contractors look up NAICS codes
- PSC code
- Z2JZ - Maintenance, Repair, or Alteration of Real Property (general category)
Timeline
-
Posted
Mar 11, 2026
-
Listing updated
Aug 12, 2026
-
Status
Open now
What contracts like this typically pay
est. $33K-$352K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- FORT WORTH, TX
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238160 - Roofing Contractors
- Scope
- Federal
Description THIS IS NOT A REQUEST FOR QUOTE GENERAL INFORMATION: This announcement is a competitive, Firm-Fixed price, Small Business Set-Aside, procured in accordance with FAR Part 36, Construction and Architect-Engineer Contracts to determine best value.
Please note this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS).
The NIST score is required before award.
Project Scope: Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform replacement of multiple levels of roofs at the Whitney Dam Powerhouse to include TPO and Standing Seam Metal Roof per the Statement of Work (SOW).
The Contractor shall be required to perform within the standards of this contract.
This project is to replace the existing metal roof, gutters, and downspouts, at Lake Whitney Powerhouse Generation Bay.
The existing metal roof is a Metal Roofing Overbuild on the original low slope roof system, on a concrete deck.
The project requires the replacement of the existing metal roof panels, gutters, and down spouts.
The existing metal roofing overbuild structural framing system will be reused.
The contractor must perform a structural survey of the existing roof overbuild steel framing structure prior to construction.
The structural survey must contain sufficient as-built data adequate for a third party to replicate structural analysis or fabrication of the complete roof framing.
Period of Performance is a base and plus option period for a total of 110 calendar days.
To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database.
Regist...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.