Contract · Federal
USACE SPK DBB Construction - LAR C3B North - Sacramento, CA
DEPT OF DEFENSE / DEPT OF THE ARMY SACRAMENTO, CA
- Status Closes in 34 days
- Amount Amount not listed
- Set-aside Small Business Set Aside - Total
Scope
Project Title: Lower American River Contract 3B North (LAR C3B North).
Project Location: Lower American River from Howe Avenue upstream to near Harrington Way.
Work under fully designed government specifications entails excavation, material placement, and embankment regrading; installation of soil-filled rock slope protection along the waterside levee face; construction of buried launchable rock toes and launchable overbank trenches; development of planting benches integrated with instream woody material; import and placement of riprap; structural tie-ins with existing rock revetment features; and complete temporary site stabilization across disturbed soil areas.
North American Industry Classification (NAICS) code: 237990, Other Heavy and Civil Engineering Construction.
Product or Service Code: Y1LC, Construction of Tunnels and Subsurface Structures.
Small Business Administration (SBA) size standard: $45,500,000.00 annual revenue.
The target price range is estimated to be $45,000,000.00 to $60,000,000.00.Requirement is a total (100%) Small Business set-aside.
Typical award value
What contracts like this typically pay
est. $55K-$1.4M
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
Timeline
-
Posted
Nov 10, 2026
-
Status
Open now
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.