Contract · Federal

USACE SPK DBB Construction - LAR C3B North - Sacramento, CA

DEPT OF DEFENSE / DEPT OF THE ARMY SACRAMENTO, CA

  • Status Closes in 34 days
  • Amount Amount not listed
  • Set-aside Small Business Set Aside - Total

Scope

Project Title: Lower American River Contract 3B North (LAR C3B North).

Project Location: Lower American River from Howe Avenue upstream to near Harrington Way.

Work under fully designed government specifications entails excavation, material placement, and embankment regrading; installation of soil-filled rock slope protection along the waterside levee face; construction of buried launchable rock toes and launchable overbank trenches; development of planting benches integrated with instream woody material; import and placement of riprap; structural tie-ins with existing rock revetment features; and complete temporary site stabilization across disturbed soil areas.

North American Industry Classification (NAICS) code: 237990, Other Heavy and Civil Engineering Construction.

Product or Service Code: Y1LC, Construction of Tunnels and Subsurface Structures.

Small Business Administration (SBA) size standard: $45,500,000.00 annual revenue.

The target price range is estimated to be $45,000,000.00 to $60,000,000.00.Requirement is a total (100%) Small Business set-aside.

Typical award value

What contracts like this typically pay

est. $55K-$1.4M

Estimated from 28 similar past awards nationwide, NAICS 237990.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

Timeline

  1. Posted

    Nov 10, 2026

  2. Status

    Open now

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.