Contract · Federal
Inspect and Repair of 13.2KV Main Switchgear
HOMELAND SECURITY, DEPARTMENT OF / US COAST GUARD New London, CT
- Status Closes in 12 days
- Amount Amount not listed
- Set-aside Small Business Set Aside - Total
Scope
The U.S.
Coast Guard Academy requires a qualified, licensed electrical contractor to inspect, repair as necessary, test, and restore Eaton/Cutler-Hammer MVS2 13.2 kV medium-voltage load interrupter switchgear, with primary work focused on Cabinet 5 and the associated 15 kV feeder cable serving Smith Hall.
The contractor shall inspect Cabinet 5 for damage or missing/cannibalized components; remove and replace three Eaton 15CLE-250E fuses; procure and deliver three additional matching fuses for on-site spares; perform insulation-resistance testing of the feeder cable in accordance with current ANSI/NETA standards; provide certified test and field-service reports; coordinate all required outages and lockout/tagout procedures with the Government; and safely re-energize the cabinet and feeder upon successful completion of repairs and testing.
All work shall comply with applicable OSHA, NFPA 70E, federal, state, and local requirements, including proper licensed personnel, arc-flash personal protective equipment, site protection, cleanup, and disposal of waste materials.
Typical award value
What contracts like this typically pay
est. $25K-$170K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
Timeline
-
Posted
Oct 30, 2026
-
Status
Closing soon
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.