Contract · Federal

Chino Emergency Repairs

AGRICULTURE, DEPARTMENT OF / FOREST SERVICE Chino Valley, AZ

  • Status Closes in 16 days
  • Amount Amount not listed
  • Set-aside Small Business Set Aside - Total

Scope

This project consists of providing all materials, equipment, labor, transportation, and incidentals for completion of the repair storm damage sustained on three buildings at this site.

The repairs are to include roof replacement, dry wall and insulation replacement, a door replacement, ceiling and insulation replacement, installation of gutters and downspouts, and to replace a portion of the side of the Chino Yard Office; to perform maintenance to the metal roofs on the Supervisor’s office and the Chino Shop; to repair window frames on upper windows, to caulk ALL of windows, and to install a Z bar at the roof line on the Supervisor’s Office; and to gutters and downspouts on the Chino Shop.

This project could also include, if additional funds are available, optional bid items.

The optional bid items are exterior painting on the Yard Office; replace the weather stripping on two garage doors and a door sweep on a manway; and if mold is found in the Supervisor’s Office to replace the dry wall and insulation.

Typical award value

What contracts like this typically pay

est. $156K-$4.3M

Estimated from 12 similar past awards in Arizona, NAICS 236220.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

Timeline

  1. Posted

    Oct 23, 2026

  2. Status

    Open now

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.