Contract · Federal

N045--Boiler 3 Oxygen Analyzer and Steam Flow Meter

VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF Dublin, GA

  • Status Closes in 3 days
  • Amount Amount not listed
  • Set-aside Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Scope

Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate?

For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only.

Burner 3 boiler/burner controls where applicable and local display.

Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only?

Oxygen analyzer must send signals/information to combustion controls to control trim.

What is the material of construction for the stack?

Is it single or double wall?

Stack is double walled.

Inside material is steel; outside material is galvanized steel.

Stack is 36 D Selkirk Metalbestos Model P.S.

Current operating pressure and temperature of the system for boiler #3?

Design pressure is 200 psi.

Typical operating pressure is 82 psi.

Typical operating temperature is about 330 degrees Fahrenheit.

What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)?

4-20 mA analog.

Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)?

Steam flow meter is wired into local CB Hawk analog terminal block.

Please provide nameplates for the existing oxygen analyzer and steam flow meter.

Oxygen analyzer nameplate: Steam flow meter nameplate:

Typical award value

What contracts like this typically pay

est. $24K-$183K

Estimated from 223 similar past awards nationwide, NAICS 238220.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

Timeline

  1. Posted

    Oct 22, 2026

  2. Status

    Closing soon

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.