Contract · Federal · Service-Disabled Veteran-Owned Small Business Set Aside

J041--558-22-172, Replace Chillers in AHU 1 and 2

Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF
Location
Durham, NC
Amount
Amount not listed
Posted
Jul 24, 2026
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS code
236220 - Commercial and Institutional Building Construction look up NAICS codes
PSC code
J041

Timeline

  1. Posted

    Jul 24, 2026

  2. Status

    Open now

What contracts like this typically pay

est. $75K-$6.2M

Estimated from 8 similar past awards in North Carolina, NAICS 236220.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

What this contract is for

Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF
Location
Durham, NC
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
236220 - Commercial and Institutional Building Construction
Scope
Federal

STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications.

Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed.

Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants.

Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting.

As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats.

Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs.

1st shift construction activities will be allowed with approval of the COR.

Contractor to develop and coordinate phasing plan with input from staff and final approval of COR.

Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend.

Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date.

Storage: No storage of any material will be allowed on VA property unless...

Official solicitation and documents

The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.

View the official listing on SAM.gov

Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.