Contract · Federal

GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest

AGRICULTURE, DEPARTMENT OF / FOREST SERVICE Garden City, UT

  • Status Closes in 11 days
  • Amount Amount not listed
  • Set-aside Small Business Set Aside - Total

Scope

This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12.

This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.

Solicitation number 1240BH27Q0002 is issued as a Request for Quotation (RFQ) for the Tony Grove Dam Spillway Capacity & Seismic Mitigation on the Uinta/Wasatch/Cache National Forest.

This project consists of reconstructing portions of the Tony Grove Dam as shown in the drawings and described in the specifications.

This also includes replacing outlet works and raising the dam crest along with the addition of embankment material.

This acquisition is set-aside for small business concerns.

The applicable North American Industry Classification System Code is 237990.

The small business size standard is $45 Million.

This acquisition is a total Small Business set-aside.

All responsible sources may submit a quotation which will be considered by the agency.

Typical award value

What contracts like this typically pay

est. $55K-$1.4M

Estimated from 28 similar past awards nationwide, NAICS 237990.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

Timeline

  1. Posted

    Oct 5, 2026

  2. Listing updated

    Oct 20, 2026

  3. Status

    Closing soon

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.