Contract · Federal
Sewage Ejector and Line Assessment
DEPT OF DEFENSE / DEPT OF THE ARMY TULSA, OK
- Status Closes in 6 days
- Amount Amount not listed
- Set-aside None (open competition)
Scope
This scope of work requires the contractor to locate, inspect, and modify an unmapped 700 to 800 foot concrete-encased four inch cast iron sewer line and its associated distribution box, with mandatory Government presence during all site inspections.
Key tasks include installing concrete-encased Schedule 40 PVC double-Y clean-outs every 300 feet, exposing and inspecting the distribution box and its 2009 leach field connections, and extending the box cover using a riser and structural cover rated for three ton vehicle traffic protected by four concrete-encased steel safety-yellow bollards.
All physical, material, and dimensional adjustments must be documented as Red Line As-Builts on the reference drawing, and any recommended corrective actions for the lateral lines must be delivered via a detailed findings report with comprehensive labor and material cost estimates.
Typical award value
What contracts like this typically pay
est. $37K-$450K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
Timeline
-
Posted
Sep 28, 2026
-
Status
Closing soon
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.