Contract · Federal

Y1DA--630A4-26-401 MRI AHU Modification

Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF
Location
ALBANY, NY
Amount
Amount not listed
Posted
Jul 23, 2026
Set-aside
None (open competition)
NAICS code
236220 - Commercial and Institutional Building Construction look up NAICS codes
PSC code
Y1DA - Construction of Structures and Facilities (general category)

Timeline

  1. Posted

    Jul 23, 2026

  2. Status

    Closing soon

What contracts like this typically pay

est. $36K-$1.7M

Estimated from 16 similar past awards in New York, NAICS 236220.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

What this contract is for

Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF
Location
ALBANY, NY
NAICS
236220 - Commercial and Institutional Building Construction
Scope
Federal

36C24226R0060 Amendment 3 630A4-26-401 MRI AHU Modification 6.

Per our teams meeting this morning, please see below RFI's; There are 3 potential options for the MRI chiller: Air cooled package at grade with glycol and pump package.

Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water.

Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only.

Does The VA have a preference for which system works better for them?

The scope of work calls for an inline pump to serve the fan coil units.

Can the VA share the reason for these extra pumps as series pumping can present issues.

If the additional head is included in the new chiller pumps does that suffice?

There are 6 new fan coil units called for in the corridor.

This is 9 tons of cooling.

Does the corridor have that kind of a load?

Typically, corridors are only lighting and a few transient people.

Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load?

COR answer(s): It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications.

Accordingly, a series pump configuration is not considered an acceptable design.

The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity.

The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.

Official solicitation and documents

The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.

View the official listing on SAM.gov

Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.