Contract · Federal
Demolition, Removal, and Remediation
- Agency
- TRANSPORTATION, DEPARTMENT OF / OFFICE OF THE SECRETARY
- Location
- Glens Falls, NY
- Amount
- Amount not listed
- Posted
- Jul 23, 2026
- Set-aside
- None (open competition)
- NAICS code
- 238910 - Site Preparation Contractors look up NAICS codes
- PSC code
- F999
Timeline
-
Posted
Jul 23, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $34K-$267K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- TRANSPORTATION, DEPARTMENT OF / OFFICE OF THE SECRETARY
- Location
- Glens Falls, NY
- NAICS
- 238910 - Site Preparation Contractors
- Scope
- Federal
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below.
This task involves the preparation and submission of a draft and final Work Plan.
The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below.
To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.
The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1.
Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report.
The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary.
Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped.
In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required.
Copies of the permits shall be attached to the work plan as an appendix.
Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed.
The work plan shall also include a Risk Management Plan tha...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.