Contract · Federal · Small Business Set Aside - Total
Galveston HVAC Repair/Replacement
- Agency
- COMMERCE, DEPARTMENT OF / NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Location
- Galveston, TX
- Amount
- Amount not listed
- Posted
- Sep 10, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors look up NAICS codes
- PSC code
- J041
Timeline
-
Posted
Sep 10, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $86K-$586K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- COMMERCE, DEPARTMENT OF / NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Location
- Galveston, TX
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
- Scope
- Federal
The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No.
1333MF26Q0110.
Combined Synopsis Solicitation: 1333MF26Q0110 CAR 1352.246-70 final inspection and acceptance will occur at the NOAA Galveston facility An updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation.
Revisions are clearly identified in “red font”.
Response to Questions: Q&A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements) All questions were due from vendors by 10am EST 9/10 Q1-Please confirm the required nominal capacity for the three Mitsubishi PKA-A30KA6 replacements.
The SOW describes these as 2-ton systems, while the model designation appears to indicate a different nominal capacity.
A1 - There are two (2) 2 ½ ton and one (1) 2 ton machines in the Turtle Hospital.
Clarified in more detail for question 14.
Q2-Please provide the required capacity of each indoor head serving the new 3-ton dual-head system in the Turtle Barn Aquaculture Area.
A2- should be a (2) two ton unit with each head being a one (1) ton unit Q3-Please confirm the voltage, phase, available breaker capacity, and whether the existing electrical circuits may be reused.
A3 - Existing circuits will be reused.
The new breaker for the turtle barn will be added by NOAA, it will be a 208volt Q4-Please clarify whether the base-year CLIN must include all four quarterly preventive-maintenance visits in addition to the five-system installation.
A4 - Yes, base year must include quarterly preventive maintenance.
Q5-Please confirm the correct option-year CLIN numbering.
The solicitation identifies the option CLINs as 0002–0005 in one section and 1001–4001 in another.
A...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.