Contract · Federal · Small Business Set Aside - Total
J--Amendment #4 to 1333MF26Q0108
- Agency
- COMMERCE, DEPARTMENT OF / NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Location
- KANSAS CITY, MO
- Amount
- Amount not listed
- Posted
- Sep 10, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors look up NAICS codes
- PSC code
- J041
Timeline
-
Posted
Sep 10, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $24K-$183K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- COMMERCE, DEPARTMENT OF / NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Location
- KANSAS CITY, MO
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
- Scope
- Federal
Continuation page from block 14.
The Amendment 0004 covers the final Q&A / Questions & Answers #2 within the Solicitation No.
1333MF26Q0108 Questions and Answers #2 1333MF26Q0108 (26-509) SEFSC Galveston AC Preventative Maintenance Contract Q1.
Contractor licensing.
The Statement of Work states that the contractor "must possess a working knowledge of Water Source Heat Pumps, Heat Pumps and Portable AC Units, and be licensed and hold the appropriate certifications in the state of Texas." Please confirm whether the Government requires the quoter/prime contractor to hold a Texas Department of Licensing and Regulation Air Conditioning and Refrigeration Contractor license in its own name, or whether that requirement is satisfied where the licensed contractor and the licensed and EPA-certified technicians performing the work are a subcontractor to the quoter.
A: The Personnel on site should have the applicable certifications associated with the project requirements.
Q2.
Subcontractor past performance.
Evaluation Factor 3 requires at least two past performance references and states that a quoter with no relevant past performance must affirmatively say so.
Please confirm whether, and how, the Government will consider the past performance and experience of a proposed subcontractor that will perform the technical work, where that subcontractor's references are identified as such.
A: Past performance is rated on the prime/vendor proposing.
The government does not have visibility of subcontractors.
Q3.
Limitations on subcontracting.
FAR 52.219-6 appears in the clause list; FAR 52.219-14 does not appear expressly, though FAR 52.212-5 is attached.
Please confirm that 52.219-14 is incorporated for this total small business set-aside and that the applicable limitation is paragraph (e)(1), 50 percent,...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.