Contract · Federal · Total Small Business Set-Aside (FAR 19.5)
FCI Cumberland-Refurbish Lift Station
- Agency
- JUSTICE, DEPARTMENT OF / FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
- Location
- Cumberland, MD
- Amount
- Amount not listed
- Posted
- Jul 21, 2026
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 237110 - Water and Sewer Line and Related Structures Construction look up NAICS codes
- PSC code
- 4630
Timeline
-
Posted
Jul 21, 2026
-
Status
Open now
What contracts like this typically pay
est. $37K-$450K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- JUSTICE, DEPARTMENT OF / FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
- Location
- Cumberland, MD
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237110 - Water and Sewer Line and Related Structures Construction
- Scope
- Federal
Description: The Federal Bureau of Prisons (FBOP), FCI Cumberland, intends to issue a solicitation to refurbish the institution’s wastewater lift station.
Work includes demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training.
All work must maintain continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, OSHA, and FBOP security requirements.
Place of Performance: Federal Correctional Institution Cumberland 14601 Burbridge Rd.
SE Cumberland, MD 21502 Scope of Work Includes: (See attached Statement of Work) • Removal and disposal of existing lift station equipment. • Installation of new stainless?steel NEMA 4X control panel with PLC/relay logic, VFDs, starters, surge protection, HOA switches. • New level?sensing system with redundancy and audio/visual alarms. • Installation of new grinder, auger, diverters, three wet?well pumps, and three spare pumps. • Replacement of incoming disconnects, automatic transfer switch, and associated wiring. • Upgraded grounding, conduits, surge/lightning protection, and fail?safe logic. • Full functional testing, hydrostatic testing, manufacturer startup, and calibration. • Minimum 6 hours of on?site training and provision of all as?built documentation, O&M manuals, warranties, schematics, and PLC programming.
Evaluation Factors: Award will be made on best value.
Price, past performance, and specifications will be evaluated.
Amendment to solicitation to add site visit: Site visit scheduled for July 30, 2026 at 10 AM EST Fill out NCIC and Residency forms attached to attend site visit.
Please email completed background paperwork to b...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.