Contract · Federal · Total Small Business Set-Aside (FAR 19.5)
Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- OMAHA, NE
- Amount
- Amount not listed
- Posted
- Jul 21, 2026
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 237310 - Highway, Street, and Bridge Construction look up NAICS codes
- PSC code
- Z2BD - Maintenance, Repair, or Alteration of Real Property (general category)
Timeline
-
Posted
Jul 21, 2026
-
Status
Open now
What contracts like this typically pay
est. $95K-$1.1M
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- OMAHA, NE
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310 - Highway, Street, and Bridge Construction
- Scope
- Federal
Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota.
The solicitation will close after 30 days.
The solicitation is restricted to Small Businesses.
Project Description: This project will be executed using a design-bid-build project delivery method.
The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years.
The existing MPA was originally constructed under two separate contracts.
For unknown reasons, the first constructed eastern half is 5? narrower than the western half south of the MPA centerline taxiway (335? vs.
340?).
This project will establish a uniform MPA width of 340? south of the MPA centerline taxiway.
Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement.
Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2? drop-off at edge per UFC 3-260-01, Chapter 6).
Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings.
Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.