Crooked Creek Jib Crane Work Platform and Safety Updates
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- PITTSBURGH, PA
- Amount
- Amount not listed
- Posted
- Jul 21, 2026
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 237990 - Other Heavy and Civil Engineering Construction look up NAICS codes
- PSC code
- Y1QA - Construction of Structures and Facilities (general category)
Timeline
-
Posted
Jul 21, 2026
-
Status
Open now
What contracts like this typically pay
est. $55K-$1.4M
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- DEPT OF DEFENSE / DEPT OF THE ARMY
- Location
- PITTSBURGH, PA
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- Scope
- Federal
The U.S.
Army Corps of Engineers, Pittsburgh District, has a project that involves erecting a platform on the exterior of the Control Tower at Crooked Creek Lake located in Armstrong County, PA.
The purpose of the platform is to facilitate maintenance on the previously installed jib crane which is otherwise inaccessible to workers.
The timing of this contract coincides with new OSHA requirements involving ladders and fall protection.
Therefore, while not necessarily part of erecting a platform, updates to the exterior ladder in the vicinity of the platform are made as well while the Contractor is mobilized.
The jib crane on the exterior of the Control Tower is the only means of raising and lowering the stoplogs in the raking platform of the tower.
This crane has not been regularly maintained since the 1990?s when it was installed.
Currently, the only way to reach the crane is to lean off from a permanent ladder on the exterior of the tower, or rappel from above.
Neither of these options is feasible, and the crane has started to fall into disrepair.
To install the work platform, the existing ladder cage needs to be demolished on the exterior of the tower.
The existing fall protection system is retained.
This is also consistent with new regulations that disallow ladder cages.
The platform itself is made of structural steel framing, aluminum bar grating and aluminum hand railing.
It is installed at an elevation such that maintenance workers can walk the length of the jib while it is in the parked position to do maintenance.
The platform will have a mezzanine slide gate to allow the jib hoist to swing out over the raking platform without impacting the hand railing.The distance from the Operations Platform to the work platform is less than 24 feet, therefore no fall protection is required...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.