Contract · Federal · Small Business Set Aside - Total
30888PR260000012 - USCG STATION SAN DIEGO - KITCHEN RENOVATION - CONSTRUCTION
- Agency
- HOMELAND SECURITY, DEPARTMENT OF / US COAST GUARD
- Location
- San Diego, CA
- Amount
- Amount not listed
- Posted
- Sep 3, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 236118 - Residential Remodelers look up NAICS codes
- PSC code
- Z2JZ - Maintenance, Repair, or Alteration of Real Property (general category)
Timeline
-
Posted
Sep 3, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $35K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- HOMELAND SECURITY, DEPARTMENT OF / US COAST GUARD
- Location
- San Diego, CA
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 236118 - Residential Remodelers
- Scope
- Federal
Solicitation: Station San Diego Kitchen Renovation Set-Aside: Total Small Business Set-Aside (FAR Subpart 19.5) Location: USCG Station San Diego, Building F (Kitchen), 2170 N.
Harbor Drive, San Diego, CA 92101 Important Dates Questions Due: September 16, 2026 Proposals Due: September 21, 2026, by 11:59 PM Eastern Time 1.
Project Background and Objective The U.S.
Coast Guard requires complete renovations of the kitchen at Station San Diego (Building F).
The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to modernize the kitchen space.
2.
Scope of Work (Summary) - Please review the attached Statement of Work (SOW) for full technical requirements, safety standards, and applicable codes.
The Contractor is responsible for the demolition of existing materials and the installation of new cabinetry, countertops, appliances, and fixtures.
Key tasks include: Electrical & Plumbing: Install three (3) new electrical outlets along the SAR Locker Room Wall.
Remove the existing garbage disposal and sump pump; furnish and install a new garbage disposal, sump pump, and single-basin stainless steel sink.
Cabinetry & Countertops: Furnish and install new kitchen cabinets and countertops along the Window Wall and SAR Locker Room Wall.
Install a new countertop for the Kitchen Island.
Appliances: Furnish and install a new stainless-steel dishwasher, stove, microwave, and a portable stainless-steel refrigerator.
Finishing & Painting: Prepare all wall surfaces (patching, sanding, priming) and paint the entire kitchen space.
Testing & Commissioning: Verify load capacity on new breakers, pressure test plumbing lines, and test all appliance functions.
3.
Site Conditions & Hazardous Materials An Asbestos and Lead Survey was conducted for this...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.