Contract · State & Local
Sheldon Road Profile Raising & Bridge Replacement
- Agency
- Northeast Ohio Regional Sewer District - Watershed Programs
- Location
- Cleveland, OH
- Amount
- Amount not listed
- Posted
- Aug 18, 2026
- Set-aside
- None (open competition)
Timeline
-
Posted
Aug 18, 2026
-
Listing updated
Sep 12, 2026
-
Status
Closing soon
What this contract is for
- Agency
- Northeast Ohio Regional Sewer District - Watershed Programs
- Location
- Cleveland, OH
- Scope
- State & Local
The Sheldon Road Profile Raising & Bridge Replacement Project (Project) is located along Sheldon Road, on the community border of Brook Park and Middleburg Heights. The project is located within the Abram Creek watershed, a tributary to the Rocky River. Local flooding occurs as early as the 2-year storm event along a portion of Sheldon Road, between Eastland Road and Engle Road, leading to impassable flooding of Sheldon Road. A contributing factor to the flooding is the existing cast-in-place reinforced concrete rigid frame (box) structure beneath Sheldon Road, which is in a state of deterioration. The project involves the construction of a 60' single span prestressed concrete box beam bridge to replace the existing box culvert. This design will result in a bridge structure with a profile set above the 100-year water surface elevation. The Project will also involve raising the profile of a 1,060-feet length of Sheldon Road by an average of 2.97-feet (maximum elevation change 5.53-feet). The raised roadway consists of 2 - 11 ft. lanes with 2 - 4 ft shoulders, 30 ft. total width, with a 1.25 ft wide parapet that does not extend beyond the bridge approach slab. The design includes a 10 ft wide sidewalk across the north side of the bridge/approach slabs and 5 ft. sidewalk on the north roadway approaches. The objective of this project is to address the structural deterioration of the existing box culvert and improve the conveyance of stormwater flows up to the 100-year design storm, elimination the overtopping of Abram Creek onto Sheldon Road.
Contract/Solicitation #: EB-2512
Type: STORMWATER PUBLIC IMPROVEMENT BID
Department: Watershed Programs
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Get contracts like this one matched to your business, free.