Contract · Federal · Service-Disabled Veteran-Owned Small Business Set Aside

Y1DZ--556-25-102 Green House Homes Steam (VA-26-00036216)

Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF
Location
MILWAUKEE, WI
Amount
Amount not listed
Posted
Jul 27, 2026
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS code
238220 - Plumbing, Heating, and Air-Conditioning Contractors look up NAICS codes
PSC code
Y1DZ - Construction of Structures and Facilities (general category)

Timeline

  1. Posted

    Jul 27, 2026

  2. Status

    Closing soon

What contracts like this typically pay

est. $24K-$183K

Estimated from 223 similar past awards nationwide, NAICS 238220.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

What this contract is for

Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF
Location
MILWAUKEE, WI
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
Scope
Federal

DESCRIPTION PRESOLICITATION NOTICE Contractor shall provide all tools, materials, labor, quality assurance, and supervision in accordance with construction documents, drawings and specifications to complete project 556-25-102 Green House Homes Steam Utility at Captain James A.

Lovell Federal Health Care Center (FHCC), North Chicago, IL.

This requirement is to provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully functional project as described throughout the contract documents.

The purpose of this project is to provide steam service to Green House Homes 201 and 202.

Existing gas fired hot water boilers (2 per home) and gas fired steam generators (1 per home) are to be replaced.

Steam-to-Hot Water heat exchangers will replace gas fired hot water boilers and clean steam duct mounted humidifiers will replace exiting setup.

Both homes are anticipated to be occupied during work.

Construction will be phased to reduce impact on residents and FHCC operations.

Removal and installation of duct mounted humidifier will be a one-day event (per home) due to AHU shutdown.

All material will be required to be on site, and interior of ductwork immediately near installation will be clean and free of debris prior to AHU being returned to service.

SEASONAL RESTRICTON: Due to impact on hydronic re-heat systems, work cannot occur during winter.

Contractor is required to expedite planning and execution of this work, enabling the work to start and finish within the Spring through Fall period (typically May to October) in which loss of re-heat is not as critical.

The solicitation, specifications and drawings will be posted on Contact Opportunities.

There will be a pre-bid conference held for this project and all prospective bidde...

Official solicitation and documents

The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.

View the official listing on SAM.gov

Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.