Contract · State & Local
TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**
South Carolina - Trident Technical College SC
- Status Closes in 14 days
- Amount Amount not listed
- Set-aside None (open competition)
Scope
This work includes but is not limited to the replacement of the 125-ton air cooled chiller and dedicated chilled water pump. Location: TTC Palmer Campus 66 Columbus St. Charleston, SC 29403 Delivery method: Design-Bid-Build Cost range: $500,000 to $600,000 Prime Contractor License (Special Standard of Responsibility): Building BD Solicitation #: H59-N401-JR Category: Construction
Timeline
-
Posted
Oct 14, 2026
-
Status
Closing soon
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Get contracts like this one matched to your business, free.