Contract · Federal · Total Small Business Set-Aside (FAR 19.5)
Y--RPFO-NCA VAULT TOILET AND REMOVAL
- Agency
- INTERIOR, DEPARTMENT OF THE / BUREAU OF LAND MANAGEMENT
- Location
- Grants, NM
- Amount
- Amount not listed
- Posted
- Jul 23, 2026
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 238910 - Site Preparation Contractors look up NAICS codes
- PSC code
- Y1FB - Construction of Structures and Facilities (general category)
Timeline
-
Posted
Jul 23, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $34K-$267K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- INTERIOR, DEPARTMENT OF THE / BUREAU OF LAND MANAGEMENT
- Location
- Grants, NM
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238910 - Site Preparation Contractors
- Scope
- Federal
The purpose of Amendment 0002 is to revise the solicitation to an open-market small business set-aside, update the NAICS and PSC Code, update period of performance and extend the solicitation due date.
All other terms and conditions remain unchanged.
Please download all attachments.
RPFO-NCA VAULT TOILET AND REMOVAL Solicitation number 140L1726Q0018 is issued as a request for quote for RPFO-NCA Vault Toilet and Removal requirement.
This announcement constitutes the only solicitation.
Offers are being requested and a separate written solicitation will not be issued.
This acquisition is set-aside for small business concerns.
This solicitation incorporates provisions and clauses by reference.
The full text of provisions and clauses may be accessed electronically at http://www.acquisition.gov/.
A detailed description of the requirement is provided in the attached Statement of Work.
The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW).
The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization.
The SOW sets forth the requirements for a Request for Quote (RFQ) for site specific vault toilet removal and installation.
The Contractor shall adhere to the following guidance during construction phase(s) of this project: Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, New Mexico State Statutes, New Mexico Department of Transportation, Occupational Safety and Health Administration...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.