Contract · Federal · Total Small Business Set-Aside (FAR 19.5)

Cedar Creek Watershed 16 & 16A Remedial Repair -NRCS Texas

Agency
AGRICULTURE, DEPARTMENT OF / FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
Location
WASHINGTON, TX
Amount
Amount not listed
Posted
Jul 23, 2026
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS code
237990 - Other Heavy and Civil Engineering Construction look up NAICS codes
PSC code
Y1QA - Construction of Structures and Facilities (general category)

Timeline

  1. Posted

    Jul 23, 2026

  2. Status

    Open now

What contracts like this typically pay

est. $55K-$1.4M

Estimated from 28 similar past awards nationwide, NAICS 237990.

This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.

What this contract is for

Agency
AGRICULTURE, DEPARTMENT OF / FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
Location
WASHINGTON, TX
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990 - Other Heavy and Civil Engineering Construction
Scope
Federal

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.

This announcement constitutes the only solicitation.

Quotations are being requested and a separate written solicitation will not be issued.

Solicitation number 12FPC326Q0043 is issued as a Request for Quotation (RFQ) for Cedar Creek Watershed 16 and 16A Remedial Repairs.

The upstream wave berm repair for both Sites 16 and 16A will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and removing and reconstructing fence as shown on the construction drawings.

The existing plunge basins for both sites have experienced erosion along the side slopes of the basin and outlet channel.

To prevent/retard future erosion, the basins will be armored with a blanket of rock riprap. [Site 16A only] Plunge basin erosion has also caused damage to the principal spillway pipe in the vicinity of the pipe outlet.

Repair of this damage includes excavating embankment material from around the damaged pipe sections; removing and reconstructing the damaged pipe cantilever, pipe support, and concrete cradle; replacing approximately 40 ft. of the damaged spillway pipe at the outlet; installing a new sand filter collar around a portion of the replaced pipe sections; and reconstructing the earthen embankment in this vicinity.

This acquisition is set-asi...

Official solicitation and documents

The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.

View the official listing on SAM.gov

Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.

How to bid on this

This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.

  1. Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
  2. Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
  3. Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
  4. Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.

Get contracts like this one matched to your business, free.