Contract · State & Local
26-014QP-FHWA AAC East Marginal Way Construction Management Services (FHWA)
- Agency
- City of Seattle - Department of Transportation
- Location
- Seattle, WA
- Amount
- Amount not listed
- Posted
- Jul 15, 2026
- Set-aside
- None (open competition)
Timeline
-
Posted
Jul 15, 2026
-
Status
Open now
What this contract is for
- Agency
- City of Seattle - Department of Transportation
- Location
- Seattle, WA
- Scope
- State & Local
Project Description: The City of Seattle, through Seattle Department of Transportation (SDOT), requests Statements of Qualifications, with the goal of contracting for the following key staff: 1 full time Resident Engineer, 2 full time Construction Inspectors, ¾ time Change Order/Scheduling specialist, ½ time Office Engineer, ½ Doc Control/Contract Admin, and 1 part time Outreach support to provide Construction Management (CM) services on the AAC East Marginal Way project, as part of the overall CM team managing the construction contract for the project. AAC East Marginal Way The AAC East Marginal Way Project includes pavement preservation work (a 2" asphalt mill & overlay) on the southern portion of E Marginal Wy S. This pavement preservation project (a mill & overlay) is intended to extend the life of the existing pavement structure by 10 to 20 years. The project was awarded a $6.87M PSRC preservation grant. Scope of AAC work is typical of completed projects. Base repairs, ADA curb ramps, Stormwater Code mandated drainage improvements, striping & signal loop restoration, and the final surfacing course will all covered by AAC. Additional improvements and funding for those will be identified during the Complete Streets planning process. Construction Contract Information Estimated construction contract value: $11 million Estimated pre-construction services (contract document review): December 2026 Estimated construction duration: February 2027 – February 2028 Estimated construction closeout: February 2028 – July 2028 Work will be accomplished in accordance with the FHWA reviewed project Plans and Specifications advertised for construction. For additional project information, please see the project website: E Marginal Way S Paving and Safet...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- This listing has no set-aside restriction ("full and open competition"), meaning any business, large or small, can bid.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.