Contract · Federal · Small Business Set Aside - Total
Titan Dorm Furniture Delivery, Installation, and De-Installation Services
- Agency
- DEPT OF DEFENSE / DEPT OF THE AIR FORCE
- Location
- VANDENBERG SFB, CA
- Amount
- Amount not listed
- Posted
- Sep 11, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 337121 look up NAICS codes
- PSC code
- 7105
Timeline
-
Posted
Sep 11, 2026
-
Status
Closing soon
What contracts like this typically pay
No award history yet for this category (NAICS 337121).
What this contract is for
- Agency
- DEPT OF DEFENSE / DEPT OF THE AIR FORCE
- Location
- VANDENBERG SFB, CA
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 337121
- Scope
- Federal
The 30th Contracting Squadron (30 CONS/PKB) at Vandenberg SFB, CA, is conducting market research to identify capable sources for a combined commercial supply and service requirement at Titan Dorm (Building 13135).
Products Required: 88 Twin XL Bunkable Bedframes: Solid hardwood/hardwood veneer construction, durable institutional finish, tool-less/hook assembly, integrated wire spring support, designed to seat 38" x 80" mattresses.
88 Twin XL Innerspring Mattresses: Finished dimensions 38" x 80" x 8"–11", firm, reversible, heavy-duty innerspring coils with continuous border wire butt-welded for perimeter edge support, institutional fluid-proof/bedbug-resistant ticking, fully compliant with 16 CFR Part 1632 and 16 CFR Part 1633.
Services & Facility Constraints: Inside Delivery & Assembly: Unloading, staging, full assembly, placement, and leveling across 44 rooms (two standalone, unbunked beds per room; rooms measure 8' x 8').
Complete removal and off-base disposal of all packing debris.
De-Installation & Haul-Away: Dismantle, remove, and transport 44 existing Full XL bedframes and mattresses from Building 13135 to the base warehouse facility.
Multi-Story Stairwell Access (No Elevators): Building 13135 has no passenger or freight elevators.
All new items must be manually carried up stairwells (clear stairwell width: 36.5 inches), and all removed assets must be manually carried down stairwells.
Critical Schedule Feasibility Meeting the required project timeline is critical.
Full building access is available 1 October 2026.
Target/desired installation completion date is 16 November 2026.
Mandatory Final Completion Date: All delivery, full assembly, and removal services must be 100% complete NO LATER THAN (NLT) 4 December 2026.
Responders must explicitly state their manufacturing lead ti...
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Get contracts like this one matched to your business, free.